Business
Cabinet clears 7 railway projects to add 2,339 km to existing network
New Delhi, Aug 16
The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of Rs 32,500 crore, which will add 2,339 km to the existing network covering states namely Uttar Pradesh, Bihar, Jharkhand, West Bengal, Telangana, Odisha and Gujarat.
The projects, which include upgradation of the existing railway lines including their quadrupling and doubling, will facilitate capacity generation for movement of 120 million tonnes of extra cargo and will also help travel of migrant workers and students, Railway Minister Ashwini Vaishnaw told reporters after the Cabinet meeting.
The projects will receive 100 per cent funding from the Central government and connect major industrial and commercial hubs of the country.
They will help increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation, the minister said.
The details of the projects are as follows: Doubling of existing Gorakhpur Cantonment (Valmiki Nagar single line section) in Uttar Pradesh (Gorakhpur, Maharajganj, Kushi Nagar) for 89.264 km, and Bihar (West Champaran) for 6.676 km.
Doubling of existing Guntur-Bibinagar single-line section in Andhra Pradesh (Guntur) for 1 km, and Telangana (Nalgonda, Yadadri Bhuvanagiri) for 139 km.
Doubling of existing Chopan-Chunar single-line section in Uttar Pradesh (Mirzapur, Sonbhadra) for 101.58 km.
Doubling between Mudkhed-Medchal and Mahbubnagar-Dhone section in Maharashtra (Nanded) for 49.15 km, Telangana (Nizamabad, Kamareddy, Medak, Wanaparthy, Jogulamba, Medchal-Malkajgiri) for 294.82 km, and Andhra Pradesh (Mahbubnagar, Kurnool and Dhone) for 73.91 km.
Quadrupling between Samakhiali and Gandhidham in Gujarat (Kutch) for 53 km.
Third line between Nergundi-Barang and Khudra Road-Vizianagaram in Odisha (Bhadrak, Jaipur, Khordha, Cuttack, and Ganjam) for 184 km, and Andhra Pradesh (Srikakulam, Vizianagaram, Visakhapatnam) for 201 km.
Son Nagar-Andal multi-tracking project in Bihar (Gaya, Aurangabad) for 132.57 km, Jharkhand (Dhanbad, Giridih, Hazaribagh, Koderma) for 201.608 km, and West Bengal (Paschim Bardhman) for 40.35 km.
4 hours ago
Vidhatri Bandi recalls losing her father just days before filming 'Max, Min and Meowzaki': Was devastatingly numb
4 hours ago
Keanu Reeves opens up on life lesson he got from bike racing
4 hours ago
New ‘Batwara 1947’ poster symbolises hope and resilience in turbulent times
4 hours ago
Anu Malik on working with Hema Malini in ‘three films’: Those memories will always remain close to my heart
4 hours ago
Shilpa Shetty: Gratitude has always been the bedrock of my life
4 hours ago
Shriya Pilgaonkar, Supriya Pilgaonkar plant 1,500 saplings to create a mini forest for birds
4 hours ago
Hilary Duff on being a part of people’s childhood: A badge of honour
4 hours ago
Harshad Chopda becomes the reason behind Shivangi Joshi’s tears
4 hours ago
SC halts Madras HC order directing statewide enforcement of cow slaughter ban in Tamil Nadu
4 hours ago
SC issues notice to Ram Janmabhoomi Teerth Kshetra Trust, seeks UP SIT report
6 hours ago
Patna civil court grants anticipatory bail to Khan Sir in coaching centre clash case
6 hours ago
I'm not Gandhiji... I would kill again: Murder convict tells Kerala court after conviction
6 hours ago
Five killed, 42 injured as two buses collide in TN's Madurai
