Business
Cabinet clears 7 railway projects to add 2,339 km to existing network
New Delhi, Aug 16
The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of Rs 32,500 crore, which will add 2,339 km to the existing network covering states namely Uttar Pradesh, Bihar, Jharkhand, West Bengal, Telangana, Odisha and Gujarat.
The projects, which include upgradation of the existing railway lines including their quadrupling and doubling, will facilitate capacity generation for movement of 120 million tonnes of extra cargo and will also help travel of migrant workers and students, Railway Minister Ashwini Vaishnaw told reporters after the Cabinet meeting.
The projects will receive 100 per cent funding from the Central government and connect major industrial and commercial hubs of the country.
They will help increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation, the minister said.
The details of the projects are as follows: Doubling of existing Gorakhpur Cantonment (Valmiki Nagar single line section) in Uttar Pradesh (Gorakhpur, Maharajganj, Kushi Nagar) for 89.264 km, and Bihar (West Champaran) for 6.676 km.
Doubling of existing Guntur-Bibinagar single-line section in Andhra Pradesh (Guntur) for 1 km, and Telangana (Nalgonda, Yadadri Bhuvanagiri) for 139 km.
Doubling of existing Chopan-Chunar single-line section in Uttar Pradesh (Mirzapur, Sonbhadra) for 101.58 km.
Doubling between Mudkhed-Medchal and Mahbubnagar-Dhone section in Maharashtra (Nanded) for 49.15 km, Telangana (Nizamabad, Kamareddy, Medak, Wanaparthy, Jogulamba, Medchal-Malkajgiri) for 294.82 km, and Andhra Pradesh (Mahbubnagar, Kurnool and Dhone) for 73.91 km.
Quadrupling between Samakhiali and Gandhidham in Gujarat (Kutch) for 53 km.
Third line between Nergundi-Barang and Khudra Road-Vizianagaram in Odisha (Bhadrak, Jaipur, Khordha, Cuttack, and Ganjam) for 184 km, and Andhra Pradesh (Srikakulam, Vizianagaram, Visakhapatnam) for 201 km.
Son Nagar-Andal multi-tracking project in Bihar (Gaya, Aurangabad) for 132.57 km, Jharkhand (Dhanbad, Giridih, Hazaribagh, Koderma) for 201.608 km, and West Bengal (Paschim Bardhman) for 40.35 km.
4 hours ago
Trump announces ‘AI Force’, plans to appoint ‘AI Czar’ as he vows to keep US ahead of China
4 hours ago
"Faulty, political and ridiculous decisions": Trump hits out at US Supreme Court over tariffs, birthright citizenship
4 hours ago
Iran sets 7 conditions for talks with US through Qatar, warns of "decisive war" if Trump rejects demands
4 hours ago
CNN reporter denied White House access, press pass seized as Trump administration enforces ban on CNN, MS NOW, Politico
4 hours ago
White House Correspondents’ Association says Trump media ban violates First Amendment
4 hours ago
Yemen's Houthis claim attack on Riyadh, heralding escalation in tensions with Saudi Arabia
4 hours ago
Trump says he plans to form 'AI Force', appoint AI 'Czar'
4 hours ago
California governor signs 13 bills to protect elections from federal interference
4 hours ago
Iran denies US claim on Hormuz oil transport
4 hours ago
PMK signals alliance rethink, TVK emerges as possible partner
4 hours ago
Property dealer beaten to death in Delhi's Kalkaji
4 hours ago
TN Forest Department steps up surveillance in Mettur after suspected leopard attacks
4 hours ago
Fire partially damages Katra helipad terminal in Jammu & Kashmir
