Business
Cabinet clears 7 railway projects to add 2,339 km to existing network
New Delhi, Aug 16
The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of Rs 32,500 crore, which will add 2,339 km to the existing network covering states namely Uttar Pradesh, Bihar, Jharkhand, West Bengal, Telangana, Odisha and Gujarat.
The projects, which include upgradation of the existing railway lines including their quadrupling and doubling, will facilitate capacity generation for movement of 120 million tonnes of extra cargo and will also help travel of migrant workers and students, Railway Minister Ashwini Vaishnaw told reporters after the Cabinet meeting.
The projects will receive 100 per cent funding from the Central government and connect major industrial and commercial hubs of the country.
They will help increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation, the minister said.
The details of the projects are as follows: Doubling of existing Gorakhpur Cantonment (Valmiki Nagar single line section) in Uttar Pradesh (Gorakhpur, Maharajganj, Kushi Nagar) for 89.264 km, and Bihar (West Champaran) for 6.676 km.
Doubling of existing Guntur-Bibinagar single-line section in Andhra Pradesh (Guntur) for 1 km, and Telangana (Nalgonda, Yadadri Bhuvanagiri) for 139 km.
Doubling of existing Chopan-Chunar single-line section in Uttar Pradesh (Mirzapur, Sonbhadra) for 101.58 km.
Doubling between Mudkhed-Medchal and Mahbubnagar-Dhone section in Maharashtra (Nanded) for 49.15 km, Telangana (Nizamabad, Kamareddy, Medak, Wanaparthy, Jogulamba, Medchal-Malkajgiri) for 294.82 km, and Andhra Pradesh (Mahbubnagar, Kurnool and Dhone) for 73.91 km.
Quadrupling between Samakhiali and Gandhidham in Gujarat (Kutch) for 53 km.
Third line between Nergundi-Barang and Khudra Road-Vizianagaram in Odisha (Bhadrak, Jaipur, Khordha, Cuttack, and Ganjam) for 184 km, and Andhra Pradesh (Srikakulam, Vizianagaram, Visakhapatnam) for 201 km.
Son Nagar-Andal multi-tracking project in Bihar (Gaya, Aurangabad) for 132.57 km, Jharkhand (Dhanbad, Giridih, Hazaribagh, Koderma) for 201.608 km, and West Bengal (Paschim Bardhman) for 40.35 km.
4 hours ago
Malavika Mohanan opens up on what recently made her fall in love with Mumbai a little more!
4 hours ago
Kajol celebrates husband, Ajay Devgn’s birthday with a funny twist
6 hours ago
NASA astronauts carry iPhones to Moon for 1st time aboard Artemis II mission
7 hours ago
US lifts sanctions on Venezuela's acting president
8 hours ago
RS: Oppn accuses govt of rushing through key bills for political 'gains' ahead of Assembly polls
8 hours ago
Not convinced that elections in India are free and fair, says Indian Overseas Congress chief Pitroda
8 hours ago
Priyanka Gandhi opens Kerala poll campaign slamming Centre and Left
8 hours ago
Tovino Thomas on how a church set for 'Pallichattambi' was so good that an old person thought it to be real!
8 hours ago
Akshay Kumar-starrer ‘Bhooth Bangla’ moves release date, to bow in cinemas on April 16
8 hours ago
Shilpa Shetty digs in nostalgia, shares what she was doing in the 90s
8 hours ago
Ranbir Kapoor’s no-show at ‘first look of Rama’ launch raises eyebrows
8 hours ago
Raj Kundra’s ‘The Great Punjab Robbery’ is locked for August 7 release
8 hours ago
Sanjay Dutt’s ‘Aakhri Sawaal’ teaser dives into fiery academic face-off, hidden past
