Toll-free Mumbai Coastal Road Project 85% done; may partly open by Jan-end
Mumbai, Jan 25
The upcoming Mumbai Coastal Road Project (MCRP) first phase is 85 per cent completed even as a part of it is likely to be opened for traffic by the month-end, while the entire project is slated for completion by May, officials said here on Thursday.
In a status report, the BrihanMumbai Municipal Corporation (BMC) said the MCRP is 10.58 kms, with 8-lanes running from the Princess Street Flyover on Marine Drive till the southern end of the Bandra Worli Sea Link, with 6 lanes inside the tunnel segment, and a dedicated lane for bus in both directions.
The project is costing Rs 13,984 crore, comprising Rs 9,384 crore construction cost and the remaining as administrative charges, physical, water, sewerage, cost contingencies, supervision, compensation paid for mangroves, shifting utilities, etc.
Of the total work in the first phase, the progress is 84.08 per cent (physical) and 79.84 per cent (financial), tunnel boring (100 per cent), land reclamation (97 per cent), constructing a 7.47 kms long sea wall (84 per cent), building 15.66 kms long three interchanges (85.5 per cent) and bridges (83 per cent).
The MCRP will cover 4.35 kms on the 111-hectares of reclaimed land with 2.19 km bridges, and the rest will be through the tunnels (2.072 kms in each direction).
The tunnel boring started in January 2021 (south-bound) and completed in January 2022, while the digging of the north-bound tunnel was taken up in April 2022 and completed in May 2023, each with 11 metres internal diameter and covered with 375 mm thick concrete plus a fire protection board on it.
For the first time in India, the SACARDO Ventilation System has been used on MCRP tunnels with provision for utility boxes and emergency exit cross-passages at every 300 metres and a 7.5 kms long new promenade for Mumbai.
An advanced traffic management control system has been provided for the twin tunnel besides four underground parking lots with a capacity of 1800 vehicles.
The MCRP will slash the commute time in both directions by at least 70 per cent and reduce fuel consumption by 34 per cent, entailing huge foreign exchange savings.
The project will reduce air and sound pollution, 70 hectares of additional green area will reduce overall pollution with provisions for cycle tracks, gardens, jogging tracks, open air theatres, etc.
The upcoming sea-wall will reduce coastal erosion and protect the shore from the storm waves that lash from the Arabian Sea, while the car parks will come up near Haji Ali, Mahalaxmi Temple and Worli.
Chief Minister Eknath Shinde announced last fortnight that a part of the toll-free MCRP, the south-bound arm, would be thrown open by the month-end.
3 hours ago
Iranian warship crew partly repatriated from Kochi amid Iran–US tensions
4 hours ago
Saira Banu on Aamir Khan’s kindness during Dilip Kumar’s illness; recalls recent visit with GF Gauri
4 hours ago
Shreya Ghoshal remembers 3-hour long bus rides in Rajasthan’s heat for singing lessons as a kid
4 hours ago
Ajay Devgn wishes Rohit Shetty a ‘dhamakedaar’ birthday, shares action-packed tribute
4 hours ago
Allu Arjun tells Lokesh Kanakaraj: May this year bring you euphoria, joy, peace and positivity!
4 hours ago
Mohammad Rafi's son Shahid Rafi talks about singer's last few moments before passing away
4 hours ago
Steven Spielberg is developing a western movie
4 hours ago
Prakash Jha decodes relationship between society, oppression and revolution
4 hours ago
I love India, I love Modi: Trump's message signals possible India visit
4 hours ago
Stray bull sparks security scare at helipad during Nitish Kumar’s Begusarai visit
4 hours ago
Excise policy case: Arvind Kejriwal, Manish Sisodia furnish security bond before Delhi court
4 hours ago
Chhattisgarh to recruit Assistant professors, others against 700 posts in govt colleges soon
4 hours ago
Congress faces internal jostling over tickets ahead of Kerala polls